Date: March 13, 2015
Project Details
The Client’s intended use of the facility enabled a design with Private residential buildings consisting of 5 bedroom duplexes on one side and Commercial buldings with 6 units of 3 bedroom flats on the other.
Duration: 20months
Location: Arepo, Ogun state.
Works done include:
- Rafter Foundation for solid ground preparation work
- Sculptural design work
- Plumbing and Electrification works
- POP design and screeding
- Tiling works
- Full interior design
- Jacuzzi and shower cubicles installation
- Well finished wardrobes
- Drainage
- Interlocking stones