Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home2/librarel/public_html/Property/wp-content/plugins/revslider/includes/operations.class.php on line 2159

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home2/librarel/public_html/Property/wp-content/plugins/revslider/includes/operations.class.php on line 2163

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home2/librarel/public_html/Property/wp-content/plugins/revslider/includes/output.class.php on line 2810
Design and Construction of Commercial buildings in Arepo – Libra Reliance Properties

Design and Construction of Commercial buildings in Arepo

Date: March 13, 2015 Category:

Project Details

The Client’s intended use of the facility enabled a design with Private residential buildings consisting of 5 bedroom duplexes on one side and Commercial buldings with 6 units of 3 bedroom flats on the other.

Duration: 20months

Location: Arepo, Ogun state.

Works done include:

  • Rafter Foundation for solid ground preparation work
  • Sculptural design work
  • Plumbing and Electrification works
  • POP design and screeding
  • Tiling works
  • Full interior design
  • Jacuzzi and shower cubicles installation
  • Well finished wardrobes
  • Drainage
  • Interlocking stones