Design and Construction of Filling Station at Ogun State

Date: March 13, 2015 Category: ,

Project Details

The project involved substantial Earthworks, Drainage, Steel formation, Underground construction and general infrastructure. We positioned 4 (Four) fuel dispensing points and Lube with underground servicing.

Works done:

  • Reinforced Concrete Flooring
  • Steel Canopy Construction
  • Underground Tank build
  • Plumbing and Electrical networks