Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home2/librarel/public_html/Property/wp-content/plugins/revslider/includes/operations.class.php on line 2159

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home2/librarel/public_html/Property/wp-content/plugins/revslider/includes/operations.class.php on line 2163

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /home2/librarel/public_html/Property/wp-content/plugins/revslider/includes/output.class.php on line 2810
The Design, Construction, Infrastructure Development and Facility Management of Daranuka Housing Estate. – Libra Reliance Properties

The Design, Construction, Infrastructure Development and Facility Management of Daranuka Housing Estate.

development project
Date: March 13, 2015 Category: , ,

Project details

The project involves a Residential Housing Development involving 27 apartments built within 6 separate buildings, mainly for expatriates.

27 units of 1 (One) room boys quarter for each flat was also constructed in the premises for the occupants’ drivers and maids. We were also commissioned

to handle the full facility management of the estate with security maintenance, cleaning, power generation and tenancy agreement as part of our duties.

Location: Lagos

Duration: 24months

Construction & Infrastructure development works include:

  • Sculptural design work
  • Plumbing and Electrification works
  • POP design and screeding
  • Tiling works
  • Full interior design
  • Jacuzzi and shower cubicles installation
  • Well finished wardrobes
  • Drainage
  • Interlocking stones
  • Central Sewage System and Treatment Plant
  • Intercomm Network

Facility Management services include:

  • Power Generation(24hrs supply)
  • Security
  • Fabric Maintenance
  • Tenancy Agreement
  • Treated Water supply
  • Environmental cleaning and Fumigation
  • Provision for health and Safety Management.